There is progress!
The basement extension is built and roofed. The big windows got measured yesterday and should be fitted in 2/3 weeks time. Kitchen and bathrooms all ordered. Those great lads work in all weathers and are cheerful with it!
Such difficult working conditions with the narrow streets and small footprint – they have shifted 22 tonnes of rubble through the front door in bags onto small vans. But they love being there – watching the Navy games and the bird life. Fabulous sunrises too!
We have just had two weeks in our rented flat in the village – Kingsand/Cawsand has building going on everywhere and the builders are keeping the cafe and pubs busy. We’re in the flat above the cafe and the smell of fried breakfast is so……….. tempting in ‘trying to be good’ January.
Some big seas and windy days – we had some good walks in between spending large sums of money ! Kitchen and bathrooms all ordered.
Sheila